Featured Project

Name: No Business Creek Tunnel and Lift Station

Description: Sewer Interceptor / Storage Tunnel

Value: $56,418,985

CONSTRUCTION METHODS

« Back to About Us

Tunnel Construction Methods

    Tunnel Boring Machine (TBM)
  • Fully Shielded TBM's
  • Earth Pressure Balance TBM's
  • Open Shields
  • Rock and Soft Ground Bore to 33' Diameter
  • Pipe Jacking to 10' Diameter
    Primary Tunnel Support & Linig Applications
  • Ribs and Boards
  • Concrete segments
  • Steel liners
  • Shotcrete (Plain and Reinforced
  • Rock bolting
  • Liner plates
  • Grouting (Consolidation and Cut Off)
    Secondary Supports
  • Monolithic Concrete
  • pipe Placement and Annulus Backfill
    Shaft Sinking
  • Caisson Sinking Shaft Excavation
  • Vertical Boring Machine Excavation
  • Vertical Compressed Air Locks
  • Ground Freezing
    Other Tunnel Disciplines
  • Pneumatic Tunneling
  • Drill and Blast
  • Gyroscopic Survey Control
  • Computerized Guidance Systems