PROJECTS
Below is a map highlight the locations of the various projects we have in progress. Roll over the location and click on the link to view additional detail.
Roll over the marker to view project details - drag to see more of the map
McNutt Creek Wastewater Interceptor
Location: Round Rock, Texas 78681
Joint Venture: Mole Kassouf
Sponsor: Mole Constructors, Inc.
Owner: City of Round Rock
8340 lineal feet of 8 foot excavated diameter tunnel with 48" Hobas liner. 3 shafts ranging from 50 to 70 feet in depth. Construction of a Pump Station.
No Business Creek Tunnel and Lift Station
Location: Snellville, Georgia 30039
Joint Venture: Mole, Jay Dee, Kassouf, Murray Hill - Joint Venture
Sponsor: Mole Constructors, Inc.
Owner: Gwinnett County Department of Water Resources
16,000 lineal feet of 12 foot diameter tunnel excavated through granite with 5 shafts ranging from 70 feet in depth to over 240 feet in depth. Construction of a Pump Station and Odor Control Facility.
Key Subcontractors / Consultants:
Lachel Felice & Associates
American Shoring, Inc.
Reynolds, Inc.
Headlands Contracting, Inc.
Riverbank Filtration Tunnel & Lift Station
Location: Louisville, Kentucky 40059
Joint Venture: Mole, Jay Dee, Murray Hill, Kassouf
Sponsor: Mole Constructors, Inc.
Owner: Louisville Water Company
8000 lineal feet of 12 foot diameter tunnel with 1 shaft 230 feet in depth. Four caissons approximately 100 feet deep each, Construction of a Pump Station and 4 Horizontal Collector Wells